Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7

How to Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7

In this video we will see how to install primavera 6.0 and connect the data base then upgrade the primavera version to primavera 6 version 7

 

install primavera 6 Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7

 

Common mistakes prevent primavera to connect to the database or database connection failed:

1- Open the primavera 6.0 source file and install it following the steps in the vedio.

2- Do not forget to select primavera stand alone in the installation, otherwise the primavera program will not be installed correctly.

3- Be sure that you have administration rights to your computer to enable the data base connection.

4- when you open primavera program right click and click run as administrator.

5- The default username and password for primavera are admin.

Watch this video and follow the steps:



Thanks and have a nice day icon smile Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7


Recommended Materials to Learn Primavera

Oracle Primavera P6 Version 8

Project Planning and Control Using Oracle Primavera P6

Project Planning & Control Using Primavera P6

 Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7 Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7  Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7 Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7  Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7 Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7

 


share small Install primavera 6.0 and upgrade from primavera 6.0 to primavera 6 version 7

Related Posts