Connect
To Top

Top 36 Free Job Description Templates

Free Job Description Templates, The most important 36 job description for construction and project management field Sample Job Descriptions, Free Printable Job Description Templates

Free Job Description Templates

Free Job Description Templates


1- Job Title – Services Manager:

Scope of Position:

The job holder will be responsible for all service related functions ranging from document control, quality assurance & control, contract administration, information technology, legal/insurance issues, claims management and shipping.This role is a key strategic one within the organization and as such is a senior appointment.

Download Services Manager Job Description template:

  • Title: PA001
    Caption: Services Manager Job Description
    Filename: pa001.pdf
    Size: 53 kB


2- Commercial Manager:

Scope of Position:

The job holder will be responsible for all service related functions ranging from procurement, expediting, cost control and accounts. This role is a key strategic one within the organization and as such is a senior appointment.

Download Commercial Manager Job Description template:

  • Title: PA002
    Caption: Commercial Manager
    Filename: pa002.pdf
    Size: 56 kB


3- Human Resources:

Scope of Position:

The job holder will be responsible for clearly defining the vision for all HR policies and procedures and translating this vision into strategic goals and operational objectives.The role is a key strategic one within the organization and as such is a senior appointment

Download Human Resources Job Description template:

  • Title: PA003
    Caption: Human Resources Manager
    Filename: pa003.pdf
    Size: 64 kB


4- On Shore Procurement Officer:

Scope of Position:

The job holder will be responsible for all services related to the procurement of the ‘on shore’ scope pf supply.The role is a significant operational function within the organization and as such is a key appointment

Download On Shore Procurement Officer Job Description template:

  • Title: PA004
    Caption: On Shore Procurement Officer
    Filename: pa004.pdf
    Size: 52 kB


5- Off Shore Procurement Officer:

Scope of Position:

The job holder will be responsible for all services related to the procurement of the ‘off shore’ scope pf supply. The role is a significant operational function within the organization and as such is a key appointment

Download Off Shore Procurement Officer Job Description template:

  • Title: PA005
    Caption: Off Shore Procurement Officer
    Filename: pa005.pdf
    Size: 52 kB


6- Cost Control / Accounts Officer:

Scope of Position:

The job holder will be responsible for all services related to the cost control and accounting for the Project.The role is a significant operational function within the organization and as such is a key appointment

Download Cost Control / Accounts Officer Job Description template:

  • Title: PA006
    Caption: Cost Control / Accounts
    Filename: pa006.pdf
    Size: 46 kB


7- Personnel / Training Officer:

Scope of Position:

The job holder will be responsible for implementing the all HR policies and procedures and translating this vision into operational objectives.The role is of significant operational importance within the organization and as such is a key appointment

Download Personnel / Training Officer Job Description template:

  • Title: PA007
    Caption: Training Officer
    Filename: pa007.pdf
    Size: 58 kB


8- On Shore Quality Control / Expediting Officer :

Scope of Position:

The job holder will be responsible for all services related to the quality control and expediting of the ‘on shore’ scope pf supply.The role is a significant operational function within the organization and as such is a key appointment.

Download On Shore Quality Control / Expediting Officer Job Description template:

  • Title: PA008
    Caption: On Shore QC / Expediting
    Filename: pa008.pdf
    Size: 50 kB


9- Document Control Officer:

Scope of Position:

The job holder will be responsible for all services related to the control of project documentation and the maintenance of contemporary records.The role is a significant operational function within the organization and as such is a key appointment.

Download Document Control Officer Job Description template:

  • Title: PA009
    Caption: Document Control Officer
    Filename: pa009.pdf
    Size: 46 kB


10- Filing Clerk:

Scope of Position:

The job holder will be responsible for filing and control of project documentation and the maintenance of contemporary records.The role is an important function within the organization and as such is a key appointment.

Download Filing Clerk Job Description template:


11-Shipping / Logistics Officer:

Scope of Position:

The job holder will be responsible for all services related to the shipping and logistics of the complete scope of supply. The role is a significant operational function within the organisation and as such is a key appointment

Download Shipping / Logistics Officer Job Description template:

  • Title: PA011
    Caption: Shipping / Logistics Officer
    Filename: pa011.pdf
    Size: 52 kB


12- Legal Executive:

Scope of Position:

The job holder will be responsible for all services related to legal, insurance and claims management issues The role is a significant operational function within the organization and as such is a key appointment.

Download Legal Executive Job Description template:

  • Title: PA012
    Caption: Legal Executive
    Filename: pa012.pdf
    Size: 53 kB


13- Quality Assurance Officer:

Scope of Position:

The job holder will be responsible for all services related to the Quality Assurance for the complete project The role is a significant operational function within the organization and as such is a key appointment.

Download Quality Assurance Officer Job Description template:

  • Title: PA013
    Caption: Quality Assurance Officer
    Filename: pa013.pdf
    Size: 51 kB


14- Contracts Administrator:

Scope of Position:

The job holder will be responsible for all services related to the administration of all contracts awarded.The role is a significant operational function within the organization and as such is a key appointment

Download Contracts Administrator Job Description template:

  • Title: PA014
    Caption: Contracts Administrator
    Filename: pa014.pdf
    Size: 51 kB


15- Offices Services:

Scope of Position:

The job holder will be responsible for providing services to ensure the smooth running of the project office.The role is an important function within the organization and as such is a main appointment.

Download Offices Services Job Description template:

  • Title: PA015
    Caption: Offices Services
    Filename: pa015.pdf
    Size: 45 kB


16- Local Authority Liaison Officer:

Scope of Position:

The job holder will be responsible for all matters related to the liaison with the local municipality, authorities and regulatory bodies.The role is a significant operational function within the organization and as such is a key appointment.

Download Local Authority Liaison Officer Job Description template:

  • Title: PA016
    Caption: Local Authority Liaison Officer
    Filename: pa016.pdf
    Size: 51 kB


17- Site Safety Officer:

Scope of Position:

The job holder will be responsible for all matters related to the site safety for the entire Project Site.The role is a significant operational function within the organization and as such is a key appointment.

Download Site Safety Officer Job Description template:

  • Title: PA017
    Caption: Site Safety Officer
    Filename: pa017.pdf
    Size: 49 kB


18- Site Security Officer:

Scope of Position:

The job holder will be responsible for all matters related to the security for the entire Project Site.The role is a significant operational function within the organization and as such is a key appointment.

Download Site Security Officer Job Description template:

  • Title: PA018
    Caption: Site Security Officer
    Filename: pa018.pdf
    Size: 50 kB


19- Public Relations Officer:

Scope of Position:

The job holder will be responsible for all matters related to external communication with the public and press in relation to issues involving or concerning the Project or the Company.

Download Public Relations Officer Job Description template:

[attachments docid=”2327″]


20- IT Manager:

Scope of Position:

The job holder will be responsible for all matters related to the IT function for the Project Team.The role is a significant operational function within the organization and as such is a key appointment.

Download IT Manager Job Description template:


21- CAD Technician:

Scope of Position:

The job holder will be responsible for all matters related to the provision of CAD support for the Project Team.

Download CAD Technician Job Description template:


22- Civil Engineer:

Scope of Position:

The Civil Engineer will be assigned responsibility for the supervision and management of the civil design and construction coordination of the project, mainly during the site phase of the work.Responsibilities will include the managing of engineering interfaces, contractors design information and supervision and management of the Civil Contractor(s) to ensure the timely and correct completion of the specified site works.

Download Civil Engineer Job Description template:


23- Structural Engineer:

Scope of Position:

The Structural Engineer will be assigned responsibility for the supervision and management of the structural design and construction coordination of the project, mainly during the site phase of the work. Responsibilities will include the managing of engineering interfaces, contractors design information and supervision and management of the Structural Contractor(s) to ensure the timely and correct completion of the specified site works.

Download Structural Engineer Job Description template:

  • Title: PA023
    Caption: Structural Engineer
    Filename: pa023.pdf
    Size: 53 kB


24- Civil Supervisor:

Scope of Position:

The Civil Supervisor will be assigned responsibility for the supervision of the civil design and construction coordination of the project during the site phase of the work. Responsibilities will include the supervision of engineering interfaces, contractors design information and supervision of the Civil Contractor(s) to ensure the timely and correct completion of the specified site works.

Download Civil Supervisor Job Description template:

  • Title: PA024
    Caption: Civil Supervisor
    Filename: pa024.pdf
    Size: 53 kB


25- Structural Supervisor:

Scope of Position:

The Structural Supervisor will be assigned responsibility for the supervision of the structural design and construction coordination of the project during the site phase of the work. Responsibilities will include the supervision of engineering interfaces, contractors design information and supervision of the Structural Contractor(s) to ensure the timely and correct completion of the specified site works.

Download Structural Supervisor Job Description template:

  • Title: PA025
    Caption: Structural Supervisor
    Filename: pa025.pdf
    Size: 53 kB


26- Melt Shop Mechanical Engineer:

Scope of Position:

The Melt Shop Mechanical Engineer will be assigned responsibility for the supervision and management of the mechanical design and construction coordination of the project, mainly during the site phase of the work. Responsibilities will include the managing of engineering interfaces, contractors design information and supervision and management of the Melt Shop supply Contractor to ensure the timely and correct completion of the specified site works.

Download Melt Shop Mechanical Engineer Job Description template:

  • Title: PA026
    Caption: Melt Shop Mechanical Engineer
    Filename: pa026.pdf
    Size: 54 kB


27- Melt Shop Fluids / Piping Engineer:

Scope of Position:

The Melt Shop Fluid System / Piping Engineer will be assigned responsibility for the supervision and management of the fluid systems and piping design and construction coordination of the project, mainly during the site phase of the work. Responsibilities will include the managing of engineering interfaces, contractors design information and supervision and management of the Melt Shop supply Contractor to ensure the timely and correct completion of the specified site works.

Download Melt Shop Fluids / Piping Engineer Job Description template:

  • Title: PA027
    Caption: Melt Shop Fluids / Piping Engineer
    Filename: pa027.pdf
    Size: 54 kB


28- Melt Shop Electrical Hardware Engineer:

Scope of Position:

The Melt Shop Electrical Hardware Engineer will be assigned responsibility for the supervision and management of the electrical hardware systems design and construction coordination of the project, mainly during the site phase of the work. Responsibilities will include the managing of engineering interfaces, contractors design information and supervision and management of the Melt Shop supply Contractor to ensure the timely and correct completion of the specified site works.

Download Melt Shop Electrical Hardware Engineer Job Description template:

  • Title: PA028
    Caption: Melt Shop Electrical Hardware Engineer
    Filename: pa028.pdf
    Size: 54 kB


29- Melt Shop Automation Engineer:

Scope of Position:

The Melt Shop Automation Engineer will be assigned responsibility for the supervision and management of the automation systems design and construction coordination of the project, mainly during the site phase of the work. Responsibilities will include the managing of engineering interfaces, contractors design information and supervision and management of the Melt Shop supply Contractor to ensure the timely and correct completion of the specified site works.

Download Melt Shop Automation Engineer Job Description template:

  • Title: PA029
    Caption: Melt Shop Automation Engineer
    Filename: pa029.pdf
    Size: 54 kB


30- Melt Shop Instrumentation Engineer:

Scope of Position:

The Melt Shop Instrumentation Engineer will be assigned responsibility for the supervision and management of the instrumentation design and construction coordination of the project, mainly during the site phase of the work. Responsibilities will include the managing of engineering interfaces, contractors design information and supervision and management of the Melt Shop supply Contractor to ensure the timely and correct completion of the specified site works.

Download Melt Shop Instrumentation Engineer Job Description template:

  • Title: PA030
    Caption: Melt Shop Instrumentation Engineer
    Filename: pa030.pdf
    Size: 54 kB


31- Materials Engineer:

Scope of Position:

The Materials Engineer will be assigned responsibility for the testing of materials used and recording of appropriate results and data during the construction phase to ensure the correct specification of material is used and is in an appropriate condition to proceed with the works.

Download Materials Engineer Job Description template:

  • Title: PA031
    Caption: Materials Engineer
    Filename: pa031.pdf
    Size: 54 kB


32- Inventory Control:

Scope of Position:

The Inventory Control Engineer will be assigned responsibility for the receipt, checking for completeness, reporting shortages, safe storage, control and issue of all equipment and materials delivered and used during the construction of the Plant.

Download Inventory Control Job Description template:

  • Title: PA032
    Caption: Inventory Control
    Filename: pa032.pdf
    Size: 52 kB


33- Quantity Surveyor:

Scope of Position:

The Quantity Surveyor will be assigned responsibility for the measurement or estimation of the quantity of materials used and the progress of construction and erection during the site phase of the Project.

Download Quantity Surveyor Job Description template:

  • Title: PA033
    Caption: Quantity Surveyor
    Filename: pa033.pdf
    Size: 53 kB


34- Utilities Engineer:

Scope of Position:

The Utilities Engineer will be assigned responsibility for the provision of the necessary utilities required to ensure the correct operation of the Plant. Responsibilities will include the identification and consolidation of utility requirements, managing of engineering interfaces, contractors design information and the arranging the provision of appropriate temporary and/or permanent utilities to the site to support construction and operation phases.

Download Utilities Engineer Job Description template:

  • Title: PA034
    Caption: Utilities Engineer
    Filename: pa034.pdf
    Size: 55 kB


35- Electrical Construction Engineer:

Scope of Position:

The Electrical Construction Engineer will be assigned responsibility for the supervision and management of the cable installation, cable termination, electrical panel installation and other installation of other associated electrical equipment to ensure the timely and correct completion of the specified works.

Download Electrical Construction Engineer Job Description template:

  • Title: PA035
    Caption: Electrical Construction Engineer
    Filename: pa035.pdf
    Size: 54 kB


36- Planner:

Scope of Position:

The Planner is responsible for the development and implementation of suitable project systems and procedures to monitor and forecast the project performance and manage changes within the project.

Download Planner Job Description template:

 


Leave a Reply

Please Login to post a comment

More in Project Management

X

Forgot Password?

Join Us

Password Reset
Please enter your e-mail address. You will receive a new password via e-mail.