Advanced Planning With Primavera Course

(0 review)
$150.00
View cart
Advanced Planning With Primavera Course

Advanced Planning With Primavera Course outlines:

1- Understand Project Management

  • Earned Value Management EVM.
    Understand the Critical Path Method CPM.
    Percentage complete types.
    Monitor the progress using level of efforts.
    Understand the Critical Path Method CPM.
    Methods to estimate activities duration.
    How to review a time schedule.

2- Understand Primavera in Depth.

  • How to perform resource leveling.
    Global change and defined fields.
    Primavera reports in depth.
    Primavera Calendars in depth.
    Primavera Import and Export in depth.
    Primavera Filter with multiple criteria.
    Assigning Activities Steps and Weightage.
    Activity usage profile and spread sheet.
    Understand Claim Digger.
    Understand Reflection in P6.
    How to create a catchup and revised schedules.
    How to create an Extension of Time (EOT).

3- MEP Guide for Planning and Scheduling

4- Planning Templates and Case Studies.


See This Guide to know how to purchase courses in our website.

Course Features

  • Lectures 2
  • Quizzes 0
  • Duration 25 hours
  • Skill level Advanced
  • Language English
  • Students 50
  • Assessments Self
  • Advanced Planning With Primavera

    • Lecture 1.1 Advanced Planning With Primavera Video Locked 25h0m
  • COMPLETION CERTIFICATE

    • Lecture 2.1 Advanced Planning With Primavera Course Certificate Locked 0m
Hany Ismael MSc, PMP is a Civil Engineering post graduate from the Liverpool University, Certified Project Management Professional PMP, involved in various multi level construction projects since 14 years, and currently working as General Manager of Planning Engineer Est. Hany believes in sharing knowledge and he is rapid in updating himself of latest project management tools and techniques such as Primavera and Excel.

Reviews

Average Rating

0
0 rating

Detailed Rating

5 stars
0
4 stars
0
3 stars
0
2 stars
0
1 stars
0